Farmhouse re-side with milled sills and cornices
Full cedar lap siding removal under lead containment, then LP SmartSide and paint. Eighteen windowsills were milled on site, each with a matching cornice fabricated to suit. April to October 2025.
Residential work in Iowa.


Full cedar lap siding removal under lead containment, then LP SmartSide and paint. Eighteen windowsills were milled on site, each with a matching cornice fabricated to suit. April to October 2025.

Repaint of a historic red heartwood exterior. The south and east sides were stripped in full, then given two coats of primer before paint.

A full paint shave on knotty redwood siding. Nail holes filled, sanded, then two coats of primer and two of paint.